The Hubii team asked us to review and audit their crowdsale and “Hubiits” (HUB) token contracts. We looked at the code and now publish our results.
The audited contracts can be found in the CoinFabrik/ico repository. The version used for this report is commit 142f43f3bec4afd0ffff3fce06946cf67cb0272f
.
We’ve found the code to be very modular and well documented. Here’s our assessment and recommendations, in order of importance.
Update: Hubii team followed most of our recommendations in the latest version of the code.
There are multiple states a Crowdsale
instance can be in. The current state can be obtained by calling getState
, and functions are enabled or disabled according to it. Said function also gives an idea of the desired sequence of states that the crowdsale should follow. It’s easy to see, however, that there are a lot more possible state transitions than those implied:
Preparing
state.Success
state), it’s possible to resume the Funding
state by setting a new cap.These kind of unexpected state transitions can have unexpected consequences, create security holes, and complicate maintenance and further development. Fix this by making transitions explicit and enforcing the states in which each function can be called.
Some examples of explicit state transitions correctly implemented are OpenZeppelin’s RefundVault and Solidity’s Documentation’s StateMachine.
Update: Hubii replied “The function where the state transitions were possible were marked as onlyOwner
, lowering the possibility of outside attack. Despite the function having the onlyOwner
modifier, we modified the contracts to prevent unexpected state transitions and removed the Preparing
state.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
Calls to preallocate
in Crowdsale.sol do not increase the investorCount
variable. If the intention is to count investors who transfer funds using this function, consider increasing the variable in this method.
Update: Hubii replied that the meaning of this variable was by design. Hubii replied “The investorCount
was designed to count investors in the crowdsale, and not early investors assigned through the preallocate function. It is designed in this way.”
Furthermore, the check in line 191 for investedAmountOf
will not increase the investor count for regular purchases if the calculated price is zero. Consider changing the guard to check for tokenAmountOf
instead.
Update: Hubii replied “Regular purchases are required to send non-zero amounts and the investorCount
is only increased when investedAmountOf
is zero to avoid counting the same address twice. Early investors who also purchased tokens through the crowdsale will also be counted correctly by checking investedAmountOf
, which won’t happen if we check tokenAmountOf
.”
The function calculatePrice
is defined in PricingStrategy
to take five arguments including weiRaised
and tokensSold
. These two are swapped in the implementation of the function in FlatPricing
and its use in Crowdsale
. It presently causes no problem because the implementation and usage are consistent. If a new pricing strategy is implemented using the documented order, the contract can break. Fix the interface to use the same order: calculatePrice(uint value
, uint weiRaised
, uint tokensSold
, address msgSender
, uint decimals)
.
Update: Hubii replied “The name of the arguments and the documentation was fixed to reflect the actual usage. But, this issue is not severe since it does not affect the contract behavior.” Fixed in c3fc1798313e3c2bd98decb57f97f74e5f003209
.
Instead of the Crowdsale
acting as owner of the token, as in most implementations (see OpenZeppelin’s Crowdsale
, there is an account that retains ownership of the token. This allows the owners to appoint themselves as minting agents at any point during the crowdsale and emit new tokens, or release the token before the crowdsale ends. This reduces the public trust on the crowdsale mechanics. Move ownership of the token to the Crowdsale
contract, and maintain control only over the upgrade mechanism by appointing the team as upgradeMaster
.
Update: Hubii replied “As suggested in another issue the setup was changed to create all the contracts from a single contract. In this way, the Crowdsale
contract is the owner of the CrowdsaleToken
.” Fixed in e9e05d7adc9efde724afee0facfc89e76db67efe
.
Methods setEndsAt
, setPricingStrategy
, setCeilingStrategy
, setFinalizeAgent
and setFundingCap
in Crowdsale.sol allow the owner to change the crowdsale rules while the crowdsale is running, changing when the crowdsale ends, the funds cap, the price and the maximum investment per address, at any stage. This requires complete trust on the owner of the crowdsale. Consider requiring these parameters at construction time, or restricting these changes to the Preparing
stage of the crowdsale only.
Update: Hubii replied “These methods are declared internal to allow modifications only during the deployment of the Crowdsale
contract, and thus, the subcontracts cannot be changed afterwards.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
preallocate
in Crowdsale.sol L239 has no checks regarding the amount of tokens being non-zero, the receiver address being non-zero, the state of the Crowdsale
being PreFunding
(allowing preallocations to be sent even on a Failed
or Finalized
crowdsale), or the cap not being exceeded. Even if the method is to be invoked only by the Crowdsale
owner, consider adding checks for all these conditions to prevent inconsistent states produced by human errors.
Update: Hubii replied “Checks were added to ensure correct values are processed by the preallocate
function to avoid any problems.” Fixed in b4fccc6dee752f9b64b5598270032fd9cec106f6
.
Both the Crowdsale
and CrowdsaleToken
contracts depend on several flags to control optional behaviors. Some examples are:
minimumFundingGoal
, which can trigger a Failure
state if set.mintable
flag that controls whether it can actually mint, even though it extends Mintable
.The many different flags and available behaviors interact in many ways, resulting in a very complex contract. More complexity means a larger attack surface. Rather than conditionally controlling different behaviors via flags, consider settling on a single behavior per class to reduce complexity.
Update: Hubii replied “Some complexity is necessary if your contract has to provide several options. We think that altering significantly the contracts is too risky at this stage of development.”
The excessive use of the strategy pattern for the crowdsale contract makes deployment and configuration much more complicated, requiring several agent configurations (setMintAgent
, setReleaseAgent
, setFinalizeAgent
), which is highly error prone. Consider defining a specialized version of Crowdsale
(maybe calling it HubiiCrowdsale
) that performs all required initialization steps, including setting up and configuring the agents and token contracts.
As a side note, note that all setAgent
methods can be invoked at any time, not just during construction. This was one of the issues that enabled the Parity MultiSig hack, though in this case the onlyOwner
modifier prevents similar attacks.
Update: Hubii replied “The split of the contract in several pieces was done to circumvent the gas limit in the mainnet last year. We understand this is not an issue now, and we have grouped the setup process within a single contract.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
loadRefund
allows to send balance into the contract so that it can be used for refunds. This money can only be withdrawn via the refund
function, by an investor requesting a refund of the same amount they had invested.
It’s possible to load more balance than necessary, and the contract provides no mechanism to withdraw the extra balance. (Note that it would be possible to withdraw it by abusing the lack of safety checks in preallocate
, as explained below, but this should not be relied upon.) Consider requiring that msg.value == weiRaised
in loadRefund
.
Update: Hubii replied “We decided to assign the excess of the refund ether to the sender address. So they can refund the excess through the normal mechanism.” Fixed in b6f8f29e8e6578d9efc56457c0aa8ff3a49f2c05
.
Although the code of the finalize function points out that “Finalizing is optional. We only call it if we are given a finalizing agent”, the Crowdsale
can never move out of the Preparing
state as per L481 if no finalize agent is set.
If the intention is for the finalize agent to be mandatory, consider accepting it as part of the constructor parameters, and remove the method to change it on the fly. On the other hand, if the intention is to support no finalize agent, ensure there is an alternative way to release the tokens, which is currently responsibility of the finalize agent.
Update: Hubii replied “As part of another issue the Preparing
stage was removed, and now the finalizeAgent
is mandatory.”
The setMultisig
function allows the owner to change the address where funds are sent. It can be used for a brief period after the crowdsale is deployed, before the investor count reaches 5. The purpose stated in the comments is to be able to fix it before the crowdsale has begun, but this is not enforced by the contract.
If the crowdsale is already running, with less than 5 investors, the owner can still change the address. If by error or malice he sets an invalid one, soon afterwards it will be impossible to change, once investor count reaches 5. For this reason, it’s not a good safety measure as it stands. Consider removing the function, or adding the onlyInEmergency
modifier.
Update: Hubii replied “The function to change the receiving address was declared internal
to only allow modifications when the contract is being deployed.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
In transferOwnership
there’s a sanity check to see that the address argument is non-zero, which can fail silently. Consider throwing if the check doesn’t pass, by changing the line to require (newOwner != 0x0);
.
Update: Hubii replied “The transferOwnership
function was modified to require the newOwner
to be non null.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
Most math operations are safe, but there’s still a few that are unchecked (these two, for instance). It’s always better to be safe and perform checked operations.
Update: Hubii replied “We updated to use safe math operations where they were not used.”
Strategy contracts PricingStrategy
and CeilingStrategy
as well as FinalizationAgent
each have an isSane
function and an accompanying one in Crowdsale
, whose apparent purpose is to validate their correct setup with respect to a Crowdsale
instance. Although the instances can be changed mid-crowdsale, they are not validated, and the contract could be left in an invalid state. Consider adding the validation for each in the setters setPricingStrategy
, setCeilingStrategy
and setFinalizeAgent
. For example, add isPricingSane();
after line 396.
Update: Hubii replied “Now setters are internal to prevent modifications during the crowdsale, and we now check if they are valid.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
Current code specifies version pragma ^0.4.11
. We recommend changing the solidity version pragma to the latest version (pragma solidity ^0.4.14
) to enforce the use of an up to date compiler; especially considering the latest version includes a security fix for the ecrecover
function, which Crowdsale.sol uses.
Update: Hubii replied “We updated our requirements to solidity v0.4.13, and removed the use of ecrecover
since it was not essential to the Crowdsale
. We didn’t update to v0.4.14 because it isn’t supported on Truffle yet.”
The compiler issues the warning Variable is declared as a storage pointer. Use an explicit “storage” keyword to silence this warning in MultiSigWallet.sol. Consider adding the required keyword to remove this warning.
Update: Hubii replied “We have added the keyword storage as suggested.” Fixed in 5a90957abf3f792951b3aad66d6eb0317f0500ca
.
The decimals field of the token is defined as uint256
both in CrowdsaleToken
and FractionalERC20
. It is, however, defined as uint8
in the ERC20 standard. Consider changing the type to uint8
.
Update: Hubii replied “We have updated the contracts to reflect the standard and declared decimals as uint8
.” Fixed in 312d8be8002dc99074dbd2a0a6db1075cc5623ed
.
Compared to the rest of the code, UpgradeAgent
is lacking in documentation and clarity. Since this is intended to be used by future developers, we believe it’s specially important that it be very well documented.
Our understanding is that a future upgraded token contract should implement an upgradeFrom
function that receives a token owner and an amount of tokens (within the owner’s balance) as parameters to transfer from the older to the new token. This function is called by the older token.
Consider renaming the parameters to owner and amount, which are more representative of their meaning. Also, consider enforcing in UpgradeAgent
that upgradeFrom
be only callable from the old token.
Update: Hubii replied “We have added documentation to the UpgradeAgent
to help understand its functionality.” Fixed in a042810f569192b074f22f33df3b52c6cdafe53a
.
There is a single test file in the codebase, which only checks a few methods on the Crowdsale
contract. Consider adding tests for finalization, refunds, crowdsale failures, preallocation, investment with customer ID and signature, among others; as well as tests for other contracts, such as the CrowdsaleToken
, including tests for the releasing and upgrading mechanisms.
Also, all tests are executed on the same set of deployed instances. This restricts all tests to be run in succession and on a single configuration, limiting testing to a single set of constructor parameters for all contracts. Consider setting up different instances on different test suites to accommodate for different configurations, as well as adding unit tests for all contracts using mocks where needed.
Update: Hubii replied “We have added several tests since the audit, and we are adding more.”
Though the code uses OpenZeppelin’s BasicToken
, ERC20
, ERC20Basic
, Ownable
, and SafeMath
, code is copied and pasted into the repository, including some style modifications such as renaming uint256
to uint
. This makes it difficult to include any security changes included with new releases of the library, as they must be manually integrated. Consider using npm for installing OpenZeppelin.
Update: Hubii replied “We will consider this for future changes in the repository.”
Crowdsale.sol states in L36 that the token contract must be FractionalERC20
(even though this is not enforced at runtime). However, in assignTokens
in L497, which is invoked from both preallocate
and invest
methods, the token contract is forced to MintableToken
. Consider changing the token field type to MintableToken
.
Also, if the CrowdsaleToken
contract is used as a token for the Crowdsale
, the token’s flag mintable
in the constructor must be set to true for the crowdsale to work. Consider removing this flag altogether, and always making mintable == true
.
Update: Hubii replied “The Crowdsale
contract was changed to always expect a Crowdsale
token. We require the CrowdsaleToken
to be mintable in this instance of the Crowdsale
.”
The crowdsale has logic to return the funds to original investors if the minimum cap is not reached (seeL437). However, this depends on the team from manually transferring the funds back to the Crowdsale
via the loadRefund
method, requiring the public to trust in a third party for effectively issuing the reimbursements. Consider locking the funds in a contract specifically designed for it until the crowdsale is known to have failed or succeeded, and only in the latter case transfer them to the team.
Update: Hubii replied “The audit is correct to point that the refunding in case of the crowdsale not reaching the minimum cap is not trustless. We consider that fixing this issue at this point of the schedule will add more risks than solutions. But we will consider it for future reference.”
There’s a problem with using timestamps and now
(alias for block.timestamp
) for contract logic, based on the fact that miners can perform some manipulation. In general, it’s better not to rely on timestamps for contract logic. The solutions is to use block.number instead, and approximate dates with expected block heights and time periods with expected block amounts.
The Crowdsale.sol contract uses timestamps in lines 484–485. The risk of miner manipulation, though, is really low. The potential damage is also limited: miners could only slightly manipulate when the crowdsale starts or ends. We recommend the team to consider the potential risk of this manipulation and switch to block.number
if necessary.
For more info on this topic, see this stack exchange question.
Update: Hubii replied “The contract has been updated to use block number instead of timestamp.” Fixed in 9db3e7cbdd4d33f7c2d2135f9f536d7e5bc73144
.
CrowdsaleToken
inherit from FractionalERC20
.setPricingStrategy
, setCeilingStrategy
, setEndsAt
and loadRefund
in Crowdsale.sol.setCeilingStrategy
function in place of the two equivalent lines in the Crowdsale
constructor.Crowdsale
will accept dates in the past as parameters for start and end. Consider adding sanity checks for that.tokensPerWei
instead of weiPerToken
in FlatPricing.sol, so the amount of tokens to be issued per investment can be calculated as a multiplication instead of a division, avoiding rounding errors.BonusFinalizeAgent
L29.isSane
in line 21 of PricingStrategy.sol could be made abstract. This would make it harder for a developer implementing a child contract to forget implementing the method.Crowdsale
contract is Haltable
but this is only used by adding the modifier stopInEmergency
to functions investInternal
and finalize
. Consider adding that modifier to other independent state-modifying functions such as loadRefund
or refund
.transferAgents
in ReleasableToken
to something more descriptive, such as lockExemptions
.minimumFundingGoal
in Crowdsale.sol constructor to be under the ceiling cap.Crowdsale
refund
mechanism and preallocate
method into Refundable
and Preallocateable
contracts respectively, to improve modularity.isSane
check (if needed) and the releaseTokenTransfer
call upon finalization, and a derived one with the bonus logic itself.require(!finalized)
in finalize
in L317 of Crowdsale.sol is redundant, since the method can only be called in state Success as per its modifier.investInternal
in line 171 of Crowdsale.sol and preallocate
in line 239 of Crowdsale.sol share a lot of code and could be refactored to using a common function.getState
is called twice in the same function in investInternal
. Consider saving the state to a variable to avoid the double call. This will also save gas.assert(send)
calls in Crowdsale.sol (L207, L212 and L443) to transfer
for simplicity.10000
from L56 of BonusFinalizeAgent
into a constant state variable, for clarity and maintainability.We’ve found the code to be very modular and well documented. Six severe security issues were found and reported, along with how to fix them. Some changes were proposed to follow best practices and reduce potential attack surface.
Update: Hubii team clarified that some of the issues found were design decisions rather than vulnerabilities. The team fixed most of the issues following our recommendations.
Note that as of the date of publishing, the above review reflects the current understanding of known security patterns as they relate to the HUB token and crowdsale contracts. We have not reviewed the related Hubii project. The above should not be construed as investment advice or an offering of HUB tokens. For general information about smart contract security, check out our thoughts here.